your commute to hitec city and financial district is just a 15 to 17 minute drive on the nehru outer ring road
Sprawled across 25 acres, this vibrant gated community offers 14 towers in total, 8 of which have already been delivered. PBEL City located away from the city but still near everything important.
1,208sft to 1,979sft
1,600+ Families Live Here
Swimming Pool
Ready to move-in
Easy Airport Access
Fully Equipped Gymnasium
16 Lakh Litre per day STP
2.43 Acres Clubhouse
HMWSSB Water Supply
INDIS Propcare Services
2 Tennis Courts
2 Swimming Pools
Location
TSPA (APPA) Junction

Peeramcheruvu, Rajendra Nagar Mandal, Ranga Reddy District, Hyderabad-500091
Open in Google Maps
off the nehru outer ring road, near lush boulder hills and a lake
If you're in a hurry,
just download the PDF brochure
Download Now
Built with precision moulded concrete structures to ensure factory-like repeatable quality in each home.
Shear Wall
Engineering
The monolithic structure is stronger, has a longer life and is more earthquake resistant.
Unified build process. Structure, walls, electrical and plumbing are installed and built simultaneously.
No need for plastering because the wall surface is smooth and precise.
Pleasing and functional interior walls that don’t have visible beams and columns.
The factory-like repetitive ‘build and check’ process ensures predictable quality.
Concrete is an excellent insulator. Our buildings are cooler and have better sound insulation.
Construction Partner
Material Brands Used
Masterplan and
Floorplans
Masterplan
Floorplans
Rotate device for best experience!
Amenities
Amenities
Facilities
The Square - Clubhouse
Sports Arena
2.43 Acre Clubhouse
Swimming Pool
Banquet Hall
Gymnasium
Yoga
Pinks N Bloos Salon/Spa
Strawberry Fields Creche
Indoor Badminton Court
Indoor Games
Squash Court
Restaurant Space
Every balcony railing has vertical divisions. This ensures that children cannot climb them.
Safety
Engineering
Depending on the height of the building, 1.1m to 1.2m high balcony railings ensure safety on any floor.
Apart from a few horizontal railing members that are a structural requirement, all other railing members are vertical.
Compliant with the Bureau of Indian Standards National Building Code.
4 level redundancy fire fighting infrastructure. Early warning smoke detectors and triple pump fire sprinkler system.
Fire Safety
Engineering
Every floor has early warning fire measures like hand-held extinguishers and water hoses.
In case a fire is too intense for early warning fire measures, follow the exit signs and evacuate the building.
A pressurized network of pipes feed the fire sprinklers in every room of your house.
Every fire sprinkler has a temperature activated glass bulb that melts at 68° Celsius.
Only the fire sprinklers in the region of the fire will activate when a fire melts the glass bulbs.
Temperature Activated Sprinkler
Three redundant water pumps activate in sequence when they sense a drop in water pressure. This ensures the sprinklers are fed with a constant water pressure.
Pump 1 is an electric pump capable of delivering 180 litres per minute.
Pump 2 is a high capacity electric pump which can deliver up to 2250 or 2850 litres per minute, depending on the height of the building. This pump switches on if Pump 1 is unable to maintain water pressure.
Pump 3 is a high capacity diesel pump which can also deliver up to 2250 or 2850 litres per minute, depending on the height of the building.
This diesel pump switches on if Pump 1 and 2 are unable to maintain water pressure or if the electrical power supply fails.
68°celsius
will melt the temperature activated glass bulb
and active the sprinkler.
Construction
Updates
4,200
At INDIS, we don’t just build landmarks, we build Lifemarks.
Built on the ethos of community living, you will always find more people sharing your interests and making life more meaningful. Sport plays an important role in character building. Kids need to explore and spread their wings to become well-rounded individuals, and adults need to stretch a little to uncover a healthier version of themselves.
Site Office:
PBEL City
Near TSPA Junction, Peerancheru Village, Rajendra Nagar Mandal, Ranga Reddy District, Telangana, 500091, India.
Registered Office:
INCOR APPA PROJECTS PRIVATE LIMITED
Plot No 69 & 70, Opposite Lane to Madhapur P.S., Kavuri Hills, Madhapur Hyderabad Hyderabad TG 500033 IN
CIN: U70200TG2015PTC101732
Phone: 040 68181800
Email: corporategovernance@indis.co.in
Registered Office:
INDIS APPA TWO PROJECTS PRIVATE LIMITED (Formerly Known as Incor Appa Two Projects Private Limited)
Plot No 69 & 70, Opposite Lane to Madhapur P.S., Kavuri Hills, Madhapur Hyderabad Hyderabad TG 500033 IN
CIN: U70100TG2017PTC115634
Phone: 040 68181800
Email: corporategovernance@indis.co.in